Layton Foundation Pros logoLayton Foundation ProsFoundation Repair · Layton, UT
Menu
piering and underpinning in Layton, UT

Layton Foundation Pros

Piering and Underpinning in Layton, UT

Piering and underpinning in Layton, UT using helical and push piers to stop settlement. Free estimates, written scope before any pier goes in.

Serving Layton and nearby communities.

Piering and underpinning stops a settling foundation from dropping further. The method transfers the building's weight down to load-bearing soil or bedrock. Layton Foundation Pros uses galvanized helical piers and steel push piers rated for the clay and sandy mix found on Davis County bench lots, where seasonal moisture swings cause uneven settlement around footings.

Most jobs start with a load assessment to figure out how many piers a wall or corner needs. Then it's excavation at access points, then pier driving. This is structural work, so it typically runs through a building permit before anything gets installed.

What's included

What's included with Piering and Underpinning

Typically included: site evaluation, pier spacing plan, excavation at pier points, pier installation to bearing strata, load transfer bracket attachment, backfill and compaction.

Optional: additional piers for perimeter-wide settlement, interior push piers for slab support, post-install monitoring visit.

Customer prep: clear access around the foundation perimeter, move landscaping or fencing near planned pier points, note any sprinkler lines in the work area.

How it works

How our Piering and Underpinning process works

  1. Load Assessment photo
    Step 1

    Load Assessment

    We analyze weight distribution on the affected wall to plan pier spacing.

  2. Access Excavation photo
    Step 2

    Access Excavation

    Small excavation points open along the foundation at each pier location.

  3. Pier Driving photo
    Step 3

    Pier Driving

    Piers are driven or screwed down until they reach stable bearing soil.

  4. Load Transfer photo
    Step 4

    Load Transfer

    Brackets connect piers to the foundation to carry structural weight.

  5. Leveling Adjustment photo
    Step 5

    Leveling Adjustment

    Hydraulic jacks raise the foundation back toward its original position.

  6. Site Restoration photo
    Step 6

    Site Restoration

    Excavated areas get backfilled and compacted to match the yard grade.

Materials

Materials and methods for Piering and Underpinning

Layton's bench-area soil moves enough each year that pier choice matters as much as installation quality.

  • Steel Push Piers photo

    Steel Push Piers

    Deliver deep support by riding weight down to bedrock, a good fit for heavier two-story homes on sloped Layton lots.

  • Helical Piers photo

    Helical Piers

    Screw-driven for torque-rated support, useful where clay layers vary in depth across a single foundation wall.

  • Underpinning Brackets photo

    Underpinning Brackets

    Connect piers to existing footings so load transfers evenly instead of concentrating at one point.

  • Hydraulic Lift Systems photo

    Hydraulic Lift Systems

    Allow controlled, incremental lifting so a settled corner comes back level without overcorrecting.

  • Galvanized Coatings photo

    Galvanized Coatings

    Protect steel piers from corrosion in Utah's freeze-thaw cycle and seasonal groundwater contact.

  • Compacted Fill Material photo

    Compacted Fill Material

    Stabilizes the soil around new piers so backfilled areas don't re-settle the following spring.

FAQs

Piering and Underpinning FAQs

How much does piering cost per pier in Layton?

Most piers run in the low thousands installed. Total project cost is driven by how many piers the affected wall needs and how deep they have to go to reach bearing soil.

Will underpinning disturb my landscaping or yard?

Excavation happens at specific pier points, not the whole yard. Plants or fencing right at those spots usually need to move before we start.

How do I know if I need piering instead of crack injection?

Cracks that widen diagonally, doors that stick, or a visibly settling corner point to structural movement that piering corrects. Small hairline cracks with no movement are often handled with injection alone.

Can piering be done without digging up my basement floor?

Exterior perimeter piers handle most wall settlement without touching interior floors. Interior push piers are only used when a slab itself needs support.

Does piering stop future settlement for good?

Properly installed piers transfer load to stable soil below the active zone. They're designed to hold even as the surface soil around them keeps shifting seasonally.

Before & after

Before and after Piering and Underpinning

  • piering and underpinning in Layton, UT
    Before
  • piering and underpinning in Layton, UT
    After

Timeline

How long does piering and underpinning take?

  1. 01

    Stage 1

    A typical pier job moves from a site visit to a finished, leveled foundation over a short, defined timeline.

  2. 02

    Site evaluation and plan

    same day

Need a schedule that fits?

Get a Free Estimate

Codes & permits

Permit filing**: about 1 week.

Pier installation: 1 to 3 days depending on pier count. Backfill and site cleanup: same day as install. Final level check: at project close-out. <!-- rover-autofix-links -->

Typically needs a permitOften no permit
[Home](/)—
[Contact](/contact)—

Next step

Get a Piering and Underpinning estimate in Layton

Settling corner? Sticking doors? Call Layton Foundation Pros at (435) 666-7601 for a free, written estimate, no obligation, before any pier goes in.

Ask about Piering and Underpinning

Tell us about the project and how to reach you.

Call (435) 666-7601